Installation

Our T-105, T-160, T-200 and T-300 devices are stationary therapy systems, and installing them requires detailed planning. Structural radiation protection must be carried out in accordance with DIN 6812.

The table below provides some key points of the interface between building and device system:

T-105

T-160

T-200

T-300

min. space [m2] for
treatment room

approx. 5

approx. 10

approx. 15

approx. 20

Mains connection

1~ 230 V,
16 A
2 wires
door switch
external warning light (option)

1~ 230 V,
35 A
2 wires
door switch
external warning light (option)

1~ 230 V,
35 A
2 wires
door switch
external warning light (option)

1~ 230 V,
35 A
2 wires
door switch
external warning light (option)

Cooling

Tap water or liquid coolant from air conditioning

Tap water or liquid coolant from air conditioning

Tap water or liquid coolant from air conditioning

Tap water or liquid coolant from air conditioning

Tube stand

movable stand or wall bracket

telescope, ceiling mounted

3D ceiling-mounted stand or
floor-mounted column on wheels

3D ceiling-mounted stand

 

 

 
# # # # # # # # #