Installation
Our T-105, T-160, T-200 and T-300 devices are stationary therapy systems, and installing them requires detailed planning. Structural radiation protection must be carried out in accordance with DIN 6812.
The table below provides some key points of the interface between building and device system:
T-105 | T-160 | T-200 | T-300 | |
| approx. 5 | approx. 10 | approx. 15 | approx. 20 |
Mains connection | 1~ 230 V, | 1~ 230 V, | 1~ 230 V, | 1~ 230 V, |
Cooling | Tap water or liquid coolant from air conditioning | Tap water or liquid coolant from air conditioning | Tap water or liquid coolant from air conditioning | Tap water or liquid coolant from air conditioning |
Tube stand | movable stand or wall bracket | telescope, ceiling mounted | 3D ceiling-mounted stand or | 3D ceiling-mounted stand |